This control panel was transformed from catastrophic failure to a fully operational unit within 72 hours.
The burnt out panel was collected from TATA Steel, Corby tube works on Friday Midday. Our engineers worked throughout the weekend to restore the panel to full operation, delivering it back to the works by 8.00am Monday morning.
By Monday evening the panel was installed, connected and the production line running once more.
Our thanks to TLA Electrical Distributors in Northampton for pulling out all the stops to supply every part needed and delivering those parts on a Saturday