Industrial Automation Specialists
Since 1990
Control panels, PLC and SCADA, built in Corby
- 36yearsIn control systems, since 1990
- BS EN 61439Panel assemblies, with BS EN 60204-1 on machinery
- One teamFrom the first drawing to the service call
- Siemens, Allen‑Bradley, MitsubishiPlus Schneider, Omron, Beckhoff and ABB
Services

Control panels
Design, build and manufacture to BS EN 61439 and BS EN 60204-1, with drawings in EPLAN or AutoCAD Electrical.
PLC
Programming, upgrades and migration on Siemens, Allen-Bradley and Mitsubishi, plus Schneider, Omron, Beckhoff and ABB, documented and maintainable.
Machine control
Control systems for individual machines and lines, with safety designed and assessed to BS EN ISO 13849-1.
SCADA and HMI
Real-time monitoring, control and visibility, integrating third-party systems and improving operator control.
Building management
BMS controls for the buildings and services around the process.
Existing plant
Replacing obsolete hardware, and finding and fixing faults on systems already running.
Service contracts
Agreed response times for the systems a site depends on.
Stratos Control Systems designs and builds industrial control panels in Corby, and provides PLC programming, SCADA systems and control system upgrades across the UK.
We work with engineering and operations teams to improve system reliability, reduce downtime, and modernise or replace obsolete control systems, backed by automation service contracts where a site needs an agreed response time.
Our engineers support Siemens, Allen-Bradley and Mitsubishi, plus Schneider, Omron, Beckhoff and ABB, delivering structured, maintainable systems designed for long-term performance.
Delivering Measurable Improvements
- Three control systems reduced to one controller, on a Weetabix production line
- A line handed back within its three-week shutdown
- Safety functions assessed to BS EN ISO 13849-1 in SISTEMA
- A panel tested, with measured values recorded, before it left the workshop
- As-built documentation accepted against an external acceptance protocol
- Plant reporting kept running through a control system changeover
Case studies
Trusted by

Weetabix: modernising a legacy production line within a three-week shutdown
Three machines on a Weetabix production line ran on separate, ageing control systems out of manufacturer support. Stratos consolidated them onto one Allen-Bradley Compact GuardLogix 5380, replaced the servo drives and encoders, rebuilt the machine safety to PL d under ISO 13849-1:2023, and handed the line back within a three-week shutdown.
Three control systems onto one Compact GuardLogix 5380, Kinetix 5500 servo drives, and a single safety system assessed to ISO 13849-1:2023.
Read the case studyReady to talk through your automation challenge?
Tell us what the system needs to do, or what it is doing that it should not. You will speak to an engineer, not an account manager.